The Guanacaste municipality of Carrillo chose RESIN8™ recycled materials to divert plastic waste from landfill and extend pavement life in this 2023 project renewing 8.7 km of public asphalt roadway.

PROJECT STUDY #

18

PROJECT STUDY #

18

- carrillo 'donkey trail'

PROJECT INFORMATION

Developer

GLP Guanacaste Land Partners LLC

Manufacturer

Pedregal

RESIN8™ selected

Asphalt Additive

Product ENRICHED

Asphalt Mix

Location

Municipality of Carrillo, Guanacaste

CONTRACTOR

Asphalt products enriched with RESIN8™ recycled content test within the required MOPT specifications.

Asphalt Mix

5 000 Tons

Resin8™ By volume

3%

RESIN8™ in use

44 Tons

PROJECT PLASTIC SUMMARY
MIXED PLASTIC WASTE DIVERTED from landfill, incineration, and the environment
Total

35 200 Kg

resin8™ recycled content
EQUAL TO

17 600 000 Chip bags

CHIP BAGS* @ 2g per empty packet